Skip to content

First build, cut away

First build, cut away, ivory colourwayFirst build, cut away, green colourway

The first build cut on its centreline, nose to the left: the Walksnail Avatar HD Moonlight camera in the nose package, the two video antennas above the nose (the port one in the nose ring's notch and the starboard one in the roof notch just aft of it, their leads and the VTX harness lane, an estimate, inside; th-blender W127.1), our brass total tube beside the camera in the cone unit, its collar in the plate's pocket and the sleeve to the coupler, the camera 15° down (th-blender W104), the 6S2P P50B pack on the CG trim slider, the Lucid on edge ahead of the Spar Box, the Q43 seat and its copper floor over the Avionics Plate, the boards along the bay, and the pusher motor in the Tail of Fuselage C v2.4B. 42 parts from the first build's parts ledger are shown (th-blender W66).

Series
The airframe
Engine
Workbench
Resolution
2400 × 1000
Source
blender/renders/24-first-build-cut-away.png

Comments on

    Comments are reviewed before they appear. Please leave out places, addresses and other personal details.

    A Supported Systems Flight

    This build log is written and kept by Supported Systems, a small studio that makes thoughtful, user-first technology. The airframe, the hangar and the simulation are ours.

    Visit supported.systems