Print timeline
Every bed in the optimal order from tools/plan_schedule.py, drawn on a 24-hour clock. The green bands are when someone is around to clear the bed. White space outside them is a finished print waiting for a person. Hover over a bed for its parts. The same data, with the trade-offs, is in schedule the print beds.
The last bed comes off on Day 6 at 04:17, after 112.0 hours of printing across 22 beds.
g01Day 1 07:00Wing Tip A (own section)1.3 hg05Day 1 08:35C VTOL Section (starboard)5.9 hg10Day 1 14:43C Tail Nose Cone Wing Tip B4.3 hg24Day 1 19:13g24-asa-C Payload Cover (blank)3.0 hg17Day 1 22:31Keel B and Stilt B Mounts8.2 hg16Day 2 07:00Servo Airspeed Radio Holders and Slider3.6 hg04Day 2 10:52C VTOL Section (port)6.0 hg13Day 2 17:04C Spar Mounts and Slide Tray4.0 hg06Day 2 21:18Wing Inners (own section)11.9 hg21Day 3 09:29C Avionics Q43 Lucid and Aria3.0 hg07Day 3 12:44Wing Outers (own section)6.3 hg03Day 3 19:18C Bay12.1 hg09Day 4 07:40C Hatch4.3 hg11Day 4 12:15Mounts Hardware and Lights2.9 hg12Day 4 15:24Plates and Fences1.3 hg15Day 4 16:59C Canopy Beacon Carrier Charge Camera Arm3.0 hg02Day 4 20:15C Front12.6 hg14Day 5 09:08Seals0.8 hg20Day 5 10:09C Spar Box7.1 hg23Day 5 17:30Clear Light Windows0.1 hg19Day 5 17:51Keel B and Stilt B Soles1.4 hg18Day 5 19:27Keel B and Stilt B Blades and Lids8.8 h
The last bed comes off on Day 7 at 08:48, after 112.0 hours of printing across 22 beds.
g01Day 1 07:00Wing Tip A (own section)1.3 hg13Day 1 17:00C Spar Mounts and Slide Tray4.0 hg19Day 1 21:13Keel B and Stilt B Soles1.4 hg17Day 1 22:50Keel B and Stilt B Mounts8.2 hg03Day 2 07:19C Bay12.1 hg24Day 2 19:40g24-asa-C Payload Cover (blank)3.1 hg20Day 2 22:59C Spar Box7.1 hg23Day 3 07:00Clear Light Windows0.1 hg18Day 3 07:20Keel B and Stilt B Blades and Lids8.8 hg09Day 3 17:00C Hatch4.3 hg14Day 3 21:35Seals0.8 hg07Day 3 22:35Wing Outers (own section)6.3 hg04Day 4 07:00C VTOL Section (port)6.0 hg12Day 4 17:00Plates and Fences1.3 hg16Day 4 18:35Servo Airspeed Radio Holders and Slider3.6 hg05Day 4 22:27C VTOL Section (starboard)5.9 hg06Day 5 07:00Wing Inners (own section)11.9 hg15Day 5 19:11C Canopy Beacon Carrier Charge Camera Arm3.0 hg10Day 5 22:27C Tail Nose Cone Wing Tip B4.3 hg21Day 6 07:00C Avionics Q43 Lucid and Aria3.0 hg11Day 6 17:00Mounts Hardware and Lights2.9 hg02Day 6 20:09C Front12.7 h
- PLA Aero (LW)
- PETG
- TPU
- Someone around to clear the bed
The workday plan puts the two longest LW-PLA beds in the daytime stretch and the 5 to 8 hour beds overnight. That is why it takes less than a day longer than being home all day. For the Survey3 build, beds g03 and g12 swap for their Survey3 versions, and the order and totals do not change.